SNB Production WorkflowGuideHow a job moves
How a job moves
One sign, from the customer's first phone call to the day it is installed — and which part of this manual covers each step.
1A customer asks for something
A job starts as a project request: somebody wrote down what a customer asked for. Sales raises it at a desk, or an inspector raises it from a phone while standing in front of the customer.
2Somebody goes and looks
Most requests book a site visit. An inspector measures and photographs what is there. Repeat orders skip it.
That survey is the moment the job becomes drawable.
3Design starts, and keeps going
Design is not a step the job waits at. It begins as soon as there is a survey to draw from, and carries on while the quotation is being priced and the project is being set up. It finishes at customer approval.
This is the part of the picture most often got wrong, which is why design is drawn beside the spine rather than in it.
A designer can be working on artwork while Sales is still agreeing a price. Waiting for the quotation before starting would add its whole duration to every job for nothing — the measurements do not change while the money is being discussed.
What design does gate is the job order. It does not hold up the quotation; it holds up the factory.
4It is priced, and the deposit is paid
Quotation is the price going out. It can be revised more than once, and every revision is kept.
The step is not finished when the customer says yes. It is finished when the deposit is in — acceptance and payment are one step here because that is what the company treats as the job being won. An accepted quotation becomes a project, and that is the only way a project is ever created.
5The customer approves the design
The customer sees a simulation and either approves it or sends it back. A rejection returns the work to the designer and is counted against the job.
This is where the design lane ends and rejoins the main line.
6The job order is approved
Both things have to be true before the factory may start: the project exists, and the customer has approved the design. The job order approval is the gate that says so — which is why the two lines join before it and not after.
Until it is given, no task can be started on any factory screen — the buttons are there and they refuse.
7Somebody hands it to the factory
Approval is not the handover. A factory manager checks the job’s production flow — a template is a starting guess, and a galvanized-steel sign needs no paint job — plans a start date, and releases it.
These are two decisions made by two people, and the manual used to show one.
The job order says the company may build this. The release says the factory is taking it on now, in this shape. Between them, the work exists and is on no screen at all — which is exactly the gap somebody notices when a job they approved this morning is nowhere on the floor this afternoon.
8The factory builds it
Production is a chain of tasks, one per department, generated from the project’s workflow template. The floor drives it from touchscreens and pulls material from the store as it goes.
9It is delivered, then billed
Then delivery — taken to site, installed and signed for — and finally the invoice, which closes the job.
What happens next
Every box above has its own pages. This is where to find them.
| Step | In this manual |
|---|---|
| Project request | Sales → Project Requests, and Inspection → Raising a request for the phone |
| Site visit | Inspection — the office’s three screens and the inspector’s four |
| Design, approval | Design — open jobs, the list, the workspace, the queue |
| Quotation & deposit | Sales → Quotations |
| Project | Sales → Projects |
| Job order approval | Settings → Reading permissions covers who may give it |
| Handed to the factory | Sales → Projects — generating, reviewing the flow, and releasing |
| Production | The factory screen — nine pages, one per button |
| Material | Inventory — material issue notes, transfers, counting |
| Delivery | Delivery |
| Invoice | Sales → Invoices, and Credit Notes to undo one |
This page is the shape of the process, not the detail of any screen. Every box above has its own pages, and they are where the fields, the buttons and the mistakes to avoid are written down.